By 121 News
Chandigarh 07th November:- This is for the information of the general public that due to repair a leakage in 1200mm I/D PSC pipe line of Phase-III (from Kajauli Water Works) at Baldev Nagar and Village Sangatpura, there will be no pumping of raw water from Water Works Kajauli to Water Works Sector 39 Chandigarh. So, on November 08th the timings of water supply for whole city shall be available in the Morning from 4.00 am to 8.00 am. at full supply and in the evening from 6.30 pm. To 8.30 pm water supply at low pressure and on November 09th the supply in the morning shall be available at low pressure and in the evening at full supply.
No comments:
Post a Comment